Online Exam

757

Instruction:
Total number of questions: 20
Time allotted: 20 Minutes
Each question carry 1 mark, no negative marks.

Note:
Click the ‘Submit Test’ button given in the bottom of this page to Submit your answers.
Test will be submitted automatically if the time expired.
Don’t refresh the page.


Online Exam

1 / 22

A) 4000 was divided into two parts such a way that when first part was invested at 3% and the second at 5%, the whole annual interest from both the investments is Rs.144, how much was put at 3%?

2 / 22

B) A and B enter into partnership with capital as 7:9. At the end of 8 months, A withdraws. If they receive the profits in the ratio of 8:9 find how long B’s capital was used?

3 / 22

C) A can do a piece of work in 40 days; B can do the same in 30 days. A started alone but left the work after 10 days, then B worked at it for 10 days. C finished the remaining work in 10 days. C alone can do the whole work in?

4 / 22

D) Two pipes A and B can separately fill a tank in 12 and 15 minutes respectively. A third pipe C can drain off 45 liters of water per minute. If all the pipes are opened, the tank can be filled in 15 minutes. What is the capacity of the tank?

5 / 22

E) A shopkeeper sells two articles at Rs.1000 each, making a profit of 20% on the first article and a loss of 20% on the second article. Find the net profit or loss that he makes?

6 / 22

F) In a can, there is a mixture of milk and water in the ratio 4 : 5. If it is filled with an additional 8 litres of milk the can would be full and ratio of milk and water would become 6 : 5. Find the capacity of the can?

7 / 22

G) A and B together have Rs. 1210. If 4/15 of A’s amount is equal to 2/5 of B’s amount, how much amount does B have?

8 / 22

H) 3 men, 4 women and 6 children can complete a work in 7 days. A woman does double the work a man does and a child does half the work a man does. How many women alone can complete this work in 7 days?

9 / 22

I) The cost of 10 kg of apples is equal to the cost of 24 kg of rice. The cost of 6 kg of flour equals the cost of 2 kg of rice. The cost of each kg of flour is Rs.20.50. Find the total cost of 4 kg of apples, 3 kg of rice and 5 kg of flour?

10 / 22

J) A trader sells 85 meters of cloth for Rs. 8925 at the profit of Rs. 15 per metre of cloth. What is the cost price of one metre of cloth?

11 / 22

K) Difference between two numbers is 5, six times of the smaller lacks by 6 from the four times of the greater. Find the numbers?

12 / 22

L) The ratio of the two natural numbers is 5 : 6. If a certain number is added to both the numbers, the ratio becomes 7 : 8. If the larger number exceeds the smaller number by 10, find the number added?

13 / 22

M) A man can row a boat at 20 kmph in still water. If the speed of the stream is 6 kmph, what is the time taken to row a distance of 60 km downstream?

14 / 22

N) A reduction of 20% in the price of salt enables a lady to obtain 10kgs more for Rs.100, find the original price per kg?

15 / 22

O) In what time a sum of money double itself at 3% per annum simple interest?

16 / 22

P) The average marks of a class of 30 students is 40 and that of another class of 50 students is 60. Find the average marks of all the students?

17 / 22

Q) A train 100 meters long completely crosses a 300 meters long bridge in 45 seconds. What is the speed of the train is?

18 / 22

R) Sum of the digits number is 8 and their product is 12. Find the difference between the digits?

19 / 22

S) How long does a train 165 meters long running at the rate of 54 kmph take to cross a bridge 660 meters in length?

20 / 22

T) Two trains travelling in the same direction at 40 and 22 kmph completely pass off another in 1 minute. If the length of the first train is 125 m, what is the length of the second train?

21 / 22

U) The sum of five numbers is 655. The average of the first two numbers is 85 and the third number is 125. Find the average of the two numbers?

22 / 22

V) The average salary of all the workers in a workshop is Rs. 8000. The average salary of 7 technicians is Rs. 12000 and the average salary of the rest is Rs. 6000. The total number of workers in the workshop is:

Your score is

The average score is 40%

Work and Wages

36

Message before starting the quiz 

Message after the timer ends 


Work and Wages

If a person can do a piece of work in ‘n’ days, then in one day, the person will do ‘1/n’ work. Conversely, if the person does ‘1/n’ work in one day, the person will require ‘n’ days to finish the work

1 / 13

1. Two friends A and B were employed to do a work. Initial deadline was fixed at 24 days. Both started working together but after 20 days, A left the work and the whole work took 30 days to complete. In how much time can B alone can do the work?

2 / 13

2. A and B took a job to be completed in 20 days. They started working together and after 12 days, C joined them and the whole job finished in 15 days. How much time would C require to complete the job if only C was hired?

3 / 13

3. 5*40

4 / 13

4. 10+20

5 / 13

5. 150/3

6 / 13

6. Three people A, B and C working individually can finish a job in 10, 12 and 20 days respectively. They decided to work together but after 2 days, A left the work and after another one day, B also left work. If they got two lacs collectively for the entire work, find the difference of the highest and lowest share.

7 / 13

7. A alone and B alone can do a work in respectively 18 and 8 days more than both working together. Find the number of days required if both work together.

8 / 13

8. Three friends A, B and C are employed to make pastries in a bakery. Working individually, they can make 60, 30 and 40 pastries respectively in an hour. They decided to work together but due to lack of resources, they had to work on shifts of 30 minutes. Find the time taken to make 185 pastries.

9 / 13

9. A person employed a group of 20 men for a construction job. These 20 men working 8 hours a day can complete the job in 28 days. The work started on time but after 18 days, it was observed that two thirds of the work was still pending. To avoid penalty and complete the work on time, the employer had to employ more men and also increase the working hours to 9 hours a day. Find the additional number of men employed if the efficiency of all men is same.

10 / 13

10. 6 men and 10 women were employed to make a road 360 km long. They were able to make 150 kilometres of road in 15 days by working 6 hours a day. After 15 days, two more men were employed and four women were removed. Also, the working hours were increased to 7 hours a day. If the daily working power of 2 men and 3 women are equal, find the total number of days required to complete the work.

11 / 13

11. A stadium was to be built in 1500 days. The contractor employed 200 men, 300 women and 750 robotic machines. After 600 days, 75% of the work was still to be done. Fearing delay, the contractor removed all women and 500 robotic machines. Also, he employed some more men having the same efficiency as earlier employed men. This led to a speedup in work and the stadium got built 50 days in advance. Find the additional number of men employed if in one day, six men, ten women and fifteen robotic machines have same work output.

12 / 13

12. 3 men and 4 women can complete a work in 10 days by working 12 hours a day. 13 men and 24 women can do the same work by working same hours a day in 2 days. How much time would 12 men and 1 women working same hours a day will take to complete the whole work?

13 / 13

13. 600 men can make a road in 500 days. They start working together but after every hundred days, 50 men leave the work. Find the total time (in days) it takes to make the road.

Submit

Your score is

The average score is 20%